Photos

Map of Phase 1A showing the roadway temporarily closed on 4th Street. The roadway is surrounded by pedestrian fencing, but sidewalks and street crossings in both the north-south and east-west directions are accessible to the public. Wayfinding signage is shown on the fencing to guide the public safely around the construction zone.